Contact
Serbia - Regional Chamber of Commerce Novi Sad
Radojević Milorad
Leave message Contact details
Parcel of land - 21235 Temerin Industrial zone, Location 1, Blocks 1,2,3,4
| For rent | |
| Infrastructure (on the site, along the site) | water, gas, telephone, internet ISDN ADSL |
| Gross and built-in area of the estate | 900000 |
| Condition of property | Not relevant |
| Name of owner | Municipality Temerin |
| Contact details of owner | +381(0)21 843-888,rodicmir@parabolanet.com |
Open in new window
Detailed description
The municipality of Temerin covers an area of 170 square kilometres and is located in the
southeast part of Bačka. In the east, it borders with the municipality of Žabalj, in the north with the municipality of Srbobran, in the west with the municipality of Vrbas, and in the south with the city of Novi Sad. Temerin is only 100 kilometres from the EU border, 80 kilometres from Belgrade, and 7 kilometres from Novi Sad. The most important roads that run through
the municipality are the E-75 international motorway, theM-22 (as of recently, it is called
the E-5 international route), and the R-120 regional road. All three roads are intersected by the R-104 regional road in the direction of Odžaci-Zmajevo- Sirig-Temerin-Žabalj. Having Novi Sad, the most developed economic centre in Vojvodina, nearby has certainly contributed to the municipality’s development so far. The biggest economic potentials lie in agriculture, metalworking, trade, services, and others. When it comes to the revenue
it generates, agriculture is a very important economic branch. The municipality of Temerin disposes of 15,748 hectares of agricultural land, which represents 92.8% of the entire municipality’s territory. Most of this land is plough land and vegetable gardens.
ABOUT LOCATION 1 :
Total area: 90 hectares;
Ownership: Private and state property;
Intended use: Small scale industry.
The site is located 2.5 km from the town centre and has access to the power supply system. Water and gas supply systems, as well as access to a fibre optic cable, already exist. Sewerage reticulation is planned.
The shortest possible period necessary for obtaining all required building permits and approvals is six months.


